Page 152 - TPM A Route to World-Class Performance
P. 152

Table 6.4 Miller M201 loss assessment record

                   Loss type     Item         Availability   Performance   Quality   Associated problems/issues   Impacts
                        -
                   Breakdown     Electrical       0                     0      0  Lost/corrupted program    Immediate stop
                                 surge/spike                                      requires setter to reload   Additionai start-up
                                                                                  and test                  cycle
                                                                                  Scrapped part             Programand
                                                                                  Possible damage to        inspection tests
                                                                                  equipment
                   Breakdown     Tool break       0                     0         Scrapped part             Immediate stop
                                                                                  New tool to be fitted   0  Purchase new tool
                                                                                  Setter needed to restart
                   Idling and    Clogged tool                 0         0      0  Affects surface quality   Reduced performance
                   minor stops                                                    Reduces cutting           Progressive build-up
                                                                                  efficiency, hence         affecting quality, not
                                                                                  increased load on         identified by operator:
                                                                                 machine, accelerated       scrap parts
                                                                                  wear
                                                                               0  Operator needs to clean
                                                                                  tool
                   Idling and    Loose chuck                                      Affects part quality      Reduced performance
                   minor stops                                                    (surface and size)        Progressive loosening
                                                                                  Operator needed to        affects quality, not
                                                                                  retighten                 identified by operator:
                                                                                                            scrap parts
                   Yield/rework   Insufficient   0                      0         Affects part dimension   0  Reduced quality
                                 coolant                                          (growth)                  Reduced availability
                                                                               0  Reduces tool life         due to tool change
                                                                               0  Increases load on machine

                     = primary impact
                   @ = secondary impact
   147   148   149   150   151   152   153   154   155   156   157