Applying the TPM improvement plan  143


                  Table 6.5 Miller M201 improvements
                                                    Benef7t for
                                                    Availability   Performance   Quality

                  Reduce cycle time
                  Programme modifications
                  Operator to load programmes       low
                  use of  coolant   ~~              low                        medium
                  Operator to change tooling        medium
                  Reposition air supply service unit   low
                  Define start-up procedure                      high          low
                  New slideway cover design         low
                  Obtain copies of  manual/drawings   low
                  Replace with new design guards    low



                                        Sep  Oct  Nov  Dec  Jan  Feb  Mar  Apr  May  Jun  Jul  Aug  Sep














                   Asset care
                                       I   I I  l l  l l  1 I  1 I  1 I  1 I  I 1  I I  l l  l l  I  I




















                                       I             I   I   I  I   I             I
                    Maintenance
                                           I  l   l  I   l   l
                    Operators              I  l   l  I   l  l
                  Figure 6.23 Miller M201 implementation programme