Page 206 - TPM A Route to World-Class Performance
P. 206
TPM for equipment designers and suppliers 183
Operational reliability Tolerance to conditions; simple manipulation; ease
of maintenance
Lifetime costs
All this is a part of continuous improvement.
TPM cocus
0 Ramp up to flawless operation.
0 Stabilizatiodchmnic loss deffition.
0 Optimizatiodcontroled decline.
0 Rapid decommissioning.
0 Lifecycle cost reduction (not shown).
Figure 9.3 What can TPM(D) delimr?
100%
67%
Total
lifetime 50% Construction specification b
cost of
equipment
(purchase,
Use,
maintenance,
disposal)
Construction Testing Full
I operation
1 2 3 4 5 6
Figure 9.4 Early equipment management leads to greater cost control andjawless operation