9.7 Typical equipment design project
framework
The core project team should include representatives from the three essential
partners as shown in Figure 9.10. This could be made up of
designer/specifier
planner/specifier
manufacturing enpeer
0 equipment operator
equipment maintainer
0 equipment supplier
0 facilitator
The kev contacts could include:
purchasing
finance
qu&q
product engineering
process engineering
Customer
Engineering
@
Operations
Figure 9.10 Delivering world-class petformance