Page 274 - TPM A Route to World-Class Performance
P. 274
248 Index
Objective testing, 182 Six loss assessment, 49, 129
Operability, 188 Skill development, 15, 72
Operator asset care, 14, 67 SMED, 108-113
Organisational learning, 168 Soccer team analogy, 38, 39
Overall equipment effectiveness (OEE), 4- Speed losses, 88, 114, 115
6, 40, 41, 65, 79, 126 Sporadic losses, 11
OEE: Standardisation, 186
best of best, 42, 43 Start-up losses, 89
door to door, 5, 6 Steering group, 160
floor to floor, 4, 5 Supervisor roles, 175
machine, 4 Supply chain, 2, 3
myths and reality, 7
vorked examples, 82-85,127-129 Team recognition, 167
Overhead projector analogy, 53 Teamworking, 39
Timing plan, 161, 163
Partnership, 34 Total productive manufacturing, 2, 5
People’s perceptions, 149-155 Totally productive operation, 1
Performance contract, 35 TPM:
Pillar champions, 11, 12,25, 75 analogies, 3540,53-61
Pilot project structure, 158, 162 administration, 2, 77, 193-211
Planned, preventative maintenance, 66 benefits, 17, 27, 28, 29
PM analysis, 50, 104 for design, 2, 74,181-192
Problem prevention cycle, 50, 99, 122 facilitator, 39
Problem prevention, 50 implementation route, 45,46, 145
Problem solving, 66, 104, 107, 108, 140, improvement plan (9 Step), 30,48, 78
142 infrastructure, 167
master plan, 171
Quality losses, 88 milestones, 46, 174
Quality maintenance, 15, 76 pilot, 47
Quotable quotes, 29 standards, 164
targets, 34
Refurbishment, 50, 93,95, 96, 130 vision, 23, 44, 148, 165, 174
Reliability Centred Maintenance (RCM), Trade unions, 34
33 Training plan, 141, 162
Resistance to change, 152, 153 Transformation losses, 172
Safety, 77, 178 User-friendliness, 185
Scoping study, 147-158
Senior management workshop, 146 Value stream, 1, 4, 193
Set up and adjustment, 87,108-113 Visual management, 69,177
Shingo, Shigeo, 108
Six losses, 5, 40, 41, 65, 85, 89 World class TPM plants, 18