Pts 2.2 Major Comments EP Pts 2.2 EP Pts 2009 † LEED 2009: Provide a process   −  −  1 for corrective action if necessary.  Option 1 basis in LEED 2.1  1 (70% or  1 (70%)  1 includes onsite renewable energy   4 yr) if use EAc1, implies same in 2.2   and 2009.  1  1  1 ∗ • LEED 2009 requires 10% or 5% improvement in building energy performance for new and



           Pts 2009  3  2     1          • The prescriptive paths for LEED 2.2 EAc1 are now also a part of the prerequisite and may also earn some EAc1 points. Of note:    • Certain Mandatory Measures are still required for all projects in LEED 2009 and are part of ASHRAE 90.1-2007.  • Option 1 subtracts on-site renewable energy from the energy used (proposed perfor





           Subcategory 2.2  EAc5:  Measurement and   Verification  EAc6: Green Power   − 2 yr)  (35%  Total 90.1-2004 Appendix G, both using a Whole Building Energy Simulation (Option 1).









           Subcategory 2009  Measurement and   Verification  EAc6: Green Power   − 2 yr)  showfile.aspx?documentID=3198




              EAc5:
                       (35%
                                                                         TABLE 4.0.0