Page 163 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 163

LEED Ener gy and Atmospher e     141

             The LEED-NC 2.2 and 2009 Reference Guides provide tables that summarize some of
             these prerequisite and credit characteristic, including the main phase of the project for
             submittal document preparation (Design or Construction).
                 Even though the entire LEED process encompasses all phases of a project, the
             prerequisites or credits that are noted as Construction Submittal credits usually have
             major actions going on through the construction phase that, unless documented through
             that time, may not be able to be verified from preconstruction documents or the built
             project. Sometimes these credits have activities associated with them that cannot or
             need not be performed until the beginning of, or subsequent to, the construction phase.
             EAp1, EAc3, EAc5, and EAc6 have been noted in the construction submittal column in
             Table 4.0.1.
                 Three of the credit subcategories listed in Table 4.0.1 have the icon EB noted after
             their title (EAc1, EAc3, and EAc5). This icon is a tool to help those who wish to proceed
             with the continuing LEED-EB certification (Existing Building) after certification of LEED-
             NC (New Construction or Major Renovation) is obtained. Those credits noted with this
             icon are usually significantly more cost-effective to implement during the construction
             of the building than later during its operation. They are also shown in Table 4.0.1. There







                                                   Construction Submittal  Applicable in LEED 2009  Location of the Site  Boundary and the Site  Area Important in the   Calculations  Related Prerequisite


               Prerequisite or Credit                         Regional Variations May Be


                                                         EB Icon



               EAp1: Fundamental Commissioning of   ∗   n/a   Yes               n/a
               the Building Energy Systems
               EAp2: Minimum Energy Performance         n/a   Yes               n/a
               EAp3: Fundamental Refrigerant            n/a   No                n/a
               Management
               EAc1: Optimize Energy Performance        Yes   Yes     No        EAp2
               EAc2: On-Site Renewable Energy           No    Yes     Yes       n/a
               EAc3: Enhanced Commissioning        ∗    Yes   Yes     No        EAp1
               EAc4: Enhanced Refrigerant Management    No    No      No        EAp3
               EAc5: Measurement and Verification  ∗    Yes   No      No        n/a
               EAc6: Green Power                   ∗    No    Yes     Not       n/a
                                                                      usually

             TABLE 4.0.1  EA EB Icon, Regional Variation Applicability, and Miscellaneous LEED 2009