Page 273 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 273
− − LEED 2009 requires all finishes are applied prior to the flush-out • option. LEED 2009 Air Testing option has stricter formaldehyde • (27 ppb versus 50 ppb). maximum. LEED 2009 has the VOC budget calculation option done • − − separately on total Adhesives and Sealants (Paints/Coatings not included). Also include adhesives from IEQc4.3
1 1 1 1 1 1
1 1 1 1 1 1
EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy EQc4.1: Low- Emitting Materials— Adhesives and Sealants EQc4.2: Low- Emitting Materials—Paints and Coatings EQc4.3: Low- Emitting Materials—Carpet Systems EQc4.4: Low- Emitting Materials— Composite Wood and Agrifiber Products EQc5: Indoor Chemical a
IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy IEQc4.1: Low-Emitting Materials— Adhesives and Sealants IEQc4.2: Low- Emitting Materials—Paints and Coatings IEQc4.3: Low-Emitting Materials— Flooring Systems IEQc4.4: Low-Emitting Materials— Composite Wood and Agrifiber Products IEQc5: Indoor Chem
239