Page 273 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 273

−  − LEED 2009 requires all finishes are applied prior to the flush-out   •    option. LEED 2009 Air Testing option has stricter formaldehyde   •    (27 ppb versus 50 ppb). maximum. LEED 2009 has the VOC budget calculation option done   •    −  − separately on total Adhesives and Sealants (Paints/Coatings not  included). Also include adhesives from IEQc4.3


           1            1           1         1         1             1


           1            1           1         1         1             1






           EQc3.2:  Construction   Indoor Air Quality   Management  Plan—Before   Occupancy  EQc4.1: Low-  Emitting  Materials—  Adhesives and   Sealants  EQc4.2:  Low- Emitting   Materials—Paints  and Coatings  EQc4.3:  Low- Emitting   Materials—Carpet  Systems  EQc4.4: Low-  Emitting  Materials—  Composite Wood   and Agrifiber   Products  EQc5: Indoor   Chemical a








           IEQc3.2:  Construction   Indoor Air Quality   Management  Plan—Before   Occupancy  IEQc4.1:  Low-Emitting  Materials—  Adhesives and   Sealants  IEQc4.2:  Low- Emitting   Materials—Paints  and Coatings  IEQc4.3:  Low-Emitting  Materials—  Flooring Systems  IEQc4.4:   Low-Emitting  Materials—  Composite Wood   and Agrifiber   Products  IEQc5: Indoor   Chem





                                                                                   239
   268   269   270   271   272   273   274   275   276   277   278