Page 277 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 277

1 LEED 2009 limits sight lines through at most two interior glazing   •    1  surfaces. The LEED 2.2 EP point is not specified.   •   The LEED 2009 EP point is as noted.  ‡  •    2  2 ∗ ASHRAE 62.1-2007 addresses additional ETS items and relative humidity issues with respect to mechanical cooling devices. It also expands the calculations to  include varia


           1         15            ‡ LEED 2009 EP point is based on meeting at a minimum two of the following for 90% or more of regularly occupied spaces:  2. “Include views of at least two of the following: vegetation, human activity, objects >70 feet from the exterior of the glazing.”  3. “Have access to unobstructed views located within the distance of three tim

                     15
           1         Total            1. “Have multiple lines of sight to vision glazing in different directions at least 90° apart.”

           EQc8.2: Daylight   and Views, Views   for 90% of Spaces  but only if consistently used throughout all the LEED credits. Environmental Chambers, including 2004 Addenda.








           IEQc8.2: Daylight   and Views, Views   TABLE 6.0.0










                                                                                   241
   272   273   274   275   276   277   278   279   280   281   282