Page 277 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 277
1 LEED 2009 limits sight lines through at most two interior glazing • 1 surfaces. The LEED 2.2 EP point is not specified. • The LEED 2009 EP point is as noted. ‡ • 2 2 ∗ ASHRAE 62.1-2007 addresses additional ETS items and relative humidity issues with respect to mechanical cooling devices. It also expands the calculations to include varia
1 15 ‡ LEED 2009 EP point is based on meeting at a minimum two of the following for 90% or more of regularly occupied spaces: 2. “Include views of at least two of the following: vegetation, human activity, objects >70 feet from the exterior of the glazing.” 3. “Have access to unobstructed views located within the distance of three tim
15
1 Total 1. “Have multiple lines of sight to vision glazing in different directions at least 90° apart.”
EQc8.2: Daylight and Views, Views for 90% of Spaces but only if consistently used throughout all the LEED credits. Environmental Chambers, including 2004 Addenda.
IEQc8.2: Daylight and Views, Views TABLE 6.0.0
241