Page 175 - The Six Sigma Project Planner
P. 175

Actions   Taken   “After” RPN   “After” DET   “After” SEV   “After” OCC




                                  Responsibility   and Due Date






                                  Recommended   Action
                   Worksheet 68. Control FMEA Worksheet




                       General Information   RPN   Detection (DET)   Occurrence (OCC)                                                                  158














                                  Current   Controls   Severity (SEV)




                                  Potential   Causes




                                  Potential   Failure   Effect




                                  Potential   Failure   Mode





                                  Function
   170   171   172   173   174   175   176   177   178   179   180