Page 178 - The Six Sigma Project Planner
P. 178
The team members should brainstorm to expand this list with ideas from their own
organization. The ideas obtained should be used to develop a process control plan that
will ensure that the organization continues to enjoy the benefits of the Six Sigma project.
A detailed business process change control plan should be prepared and placed within
the Planner in the Appendix (p. 214).
161