The team members should brainstorm to expand this list with ideas from their own
                    organization. The ideas obtained should be used to develop a process control plan that
                    will ensure that the organization continues to enjoy the benefits of the Six Sigma project.
                    A detailed business process change control plan should be prepared and placed within
                    the Planner in the Appendix (p. 214).