Page 44 - The Six Sigma Project Planner
P. 44
Identify Other Resources Needed to Complete the Project *
Examples of things to consider:
• Resource calendars for planning and scheduling
• Machinery needed
• Process time
• Materials
• Tool and die work
• Engineering prototypes
• Laboratory tests
• Gauges
• Measurement equipment
• Floor space, office space, and other facility requirements
• Furniture
• Plumbing, electrical wiring, etc.
• Ventilation and other environmental requirements
• Special storage requirements
• Clean rooms
• Safety equipment
• Forklifts, trucks, and other transportation
• Enterprise or legacy data access
• Special computer requirements (e.g., workstations, mainframes)
• Special software requirements (e.g., simulation software, CAD)
• Where will the resources come from?
• Whose permission do I need to obtain these resources?
• Special requirements (e.g., certification, safety issues)
*
Part of the official project plan.