Page 103 - The Toyota Way Fieldbook
P. 103

Chapter 5






                      Create Connected


                             Process Flow








        One-Piece Flow Is the Ideal

        Taiichi Ohno taught us that one-piece flow is the ideal. In school when you have
        the right answer for the test you get an A. The right answer is one-piece flow.
        So just go out and implement one-piece flow and you are doing lean. What
        could be easier? In fact, Ohno also taught that achieving one-piece flow  is
        extremely difficult and, in fact, not always even practical; he said:

            In 1947 we arranged machines in parallel lines or in an L-shape and tried hav-
            ing one worker operate three or four machines along the processing route. We
            encountered strong resistance among the production workers, however, even
            though there was no increase in work or hours. Our craftsmen did not like the
            new arrangement requiring them to function as multiskilled operators.  .  .  .
            Furthermore, our efforts revealed various problems. As these problems became
            clearer, they showed me the direction to continue moving in. Although young
            and eager to push, I decided not to press for quick, drastic changes, but to be
            patient.
            Ohno learned to be patient and deliberate about reducing waste while moving
        in the direction of one-piece flow, also called “continuous flow.” Products that
        move continuously through the processing steps with minimal waiting time in
        between, and the shortest distance traveled, will be produced with the highest
        efficiency. Flowing reduces throughput time, which shortens the cost to cash
        cycle and can lead to quality improvements. But Ohno learned that one-piece
        flow is fragile.



        Copyright © 2006 by The McGraw-Hill Companies, Inc. Click here for terms of use.
   98   99   100   101   102   103   104   105   106   107   108