Page 255 - The Toyota Way Fieldbook
P. 255
Chapter 10. Develop Leaders Who Live Your System 231
• Same as morning • Same as morning • Same as morning
communication communication communication
Afternoon meeting meeting meeting
Communi- • Resume • Resume production • Announce daily
cation production same same as break time overtime requirement
Meeting as break time (may vary by area)
• Overtime work
assignments
• Complete • Ensure that • Ensure that
production production is production is
requirement completed completed
• Prepare work • Verify end of day • Complete end of shift
area for next shift production levels performance tracking
• Complete • Gather production charts
production paperwork from • Complete GL shift-
End of Shift paperwork if TMs to-shift logbook
required • Prepare end-of-shift • Coordinate any repairs
• Complete daily production reports with maintenance
5S requirement • Complete TL shift- • Attend monthly shift-
• Verify work to-shift logbook to-shift meetings
completion with • Complete 5S of GL
TL work area
• Final walk-through of
work area
• Mandatory • Mandatory • Mandatory
production production overtime production overtime
overtime • Support TMs if • Support TMs if
• TMs may stay necessary necessary
overtime to work • Attend departmental
Overtime if on Quality safety and quality
Required Circle or meetings
continuous
improvement
activities with
permission of GL
Table 10-1. (Continued)
to make. The attendance is called in to the assistant manager, who has a visual
attendance board for the entire department.
Many production areas have equipment that needs to be set up or cycled
prior to production, to ensure equipment readiness. The GL is responsible for
scheduling people to begin early and perform equipment verification checks.