9: Green IT Case Studies for Energy Utilities                 149


         http://hightech.lbl.gov/documents/DATA_CENTERS/06_DataCenters-
         PGE.pdf
            The topics covered in the white paper include Air Management, Air-Side
         Economizer, Centralized Air Handling, Cooling Plant Optimization, Direct
         Liquid Cooling, Free Cooling via Water Side Economizer, Humidification
         Controls Alternatives, Power Supplies, Self Generation, and Uninterruptible
         Power Supply Systems.
            According to Brad Whitcomb, vice president, customer products and
         services at PG&E, “Energy efficiency is the number-one priority for PG&E as
         we work with our customers to meet our environmental goals. We have a
         goal of having 20% of our energy come from renewable sources by 2010.”
         PG&E worked with various IT technology consultants on its server consoli-
         dation plan to lower energy consumption in its 40,000-square foot data cen-
         ters in San Francisco, Fairfield, and Diablo Canyon, California, through
         virtualization.
            As previously mentioned in Chapter 3, before embarking on its server con-
         solidation plan, PG&E teamed with IBM Research to develop a tool to measure
         the three-dimensional temperature distributions in its data centers. IBM used
                                                                                                    ptg
         its new Mobile Measurement Technology (MMT) to survey the relevant physi-
         cal parameters of PG&E data centers and visualize via 3-D images hot spots, air
         leakage, and other inefficiencies. The data were then used to build customized
         thermal and energy models to help mitigate hot spots and rectify imbalances
         within the data center.
            IBM’s mobile measurement machine includes a position monitoring sys-
         tem with a network of up to 100 sensors that gather thermal data. A 10,000-
         square foot data center can be completely surveyed by the machine within a
         few hours. It would take several weeks for several people to survey the data
         center manually. Wireless thermal sensor technologies can also be deployed
         to measure long-term, transient temperature effects in the data center.

         PG&E Energy-Efficiency Programs

            Several IT vendors have participated in PG&E’s Energy-Efficiency
         Incentive program. Select IT vendor systems from recent product lines are
         eligible for PG&E’s incentive program for server replacement projects. These
         models exceed efficiency benchmarks established by PG&E for web serving
         and Java™ workloads. The program is strictly limited to replacement proj-
         ects, and IT vendors are partnering with PG&E to extend the program for
   179   180   181   182   183   184   185   186   187   188   189