42 Cha pte r O n e
saying “plan the work and work the plan”). Underground construc-
tion in general and pipelines and utility construction specifically are
risky operations, therefore, for a safe and successful project, coop-
eration of all parties in the construction process (owner, engineer,
contractor, subcontractor, regulatory agency, and so on) is required
with a well-defined plan and organization to complete the work.
Figure 1.24 presents a summary of planning and safety consider-
ations for planning and design phase and construction phase of the
project.
FIGURE 1.24 Sample planning and safety considerations.