Layouts and Surveying  169
                                                                                   Exhibit 7-7
                                                                                   Bearing and
                                                                                   distance.





















































          After the CM/GC’s surveyor lays out the basic parameters of the site, the subcontrac-
          tor’s surveyor takes over and establishes benchmarks (elevations) for the components
          that have to be constructed. Thus, the concrete subcontractor will lay out the location
          of the footings in relation to the property line of the building. In addition, stakes (wood-
          en slates) will be driven into the ground at the lowest point of the excavation. These
          stakes will note location of the footing and the bottom elevation of the footing. As the
          excavation of the footing continues, the subcontractor’s surveyor will constantly check
          the location and elevation of the footings.