174    Chapter Seven
         Exhibit 7-12        Project__________________________________________
                             Owner__________________________________________  Date ______________________
         Survey checklist.   Contractor_______________________________________  JobNo.____________________
                             Project Manager__________________________________  Contract No.________________
                                      Item                Name       Date   Remarks (fieldbook, page)
                             Preliminary
                             Bench marks
                                Base line

                                Existing grades
                                Property lines
                             Buildings
                                Layout stakes
                                 Footing grades
                                 Finish floorelev.
                                 Compaction tests
                                 (slab on grade)
                             Utilities
                                 Layout stakes
                                  In place grades: sewer
                                            Steam
                                                                    ELectric

                                                                             Gas
                                         Storm drain
                                  Comp. testsinbackfill
                             SITE WORK
                              Compaction (sub-grade)
                                 Curb & walk layout stakes
                                ‘In place’ grades
                                (manhole covers, catch basins,
                               etc.
                                 FINISH GRADES
                                      (1)  Large landscapes
                                      (2)  Parking, etc.
                             SPECIAL




        SUMMARY



                            • The proper layout of the building including footings, building alignment, and floor
                               elevations is a key component of the project. Thus, without a surveyor establishing
                               the critical benchmarks and elevations, a project cannot proceed.
                            • The surveyor must take into account external elements that may impact the accuracy
                               of the building’s alignment and floor elevations. This includes: