Layouts and Surveying  175
            • Wind loads
            • Solar loads and high temperatures
            • Cold temperatures
            • Building compression
            • Settlement
          • The surveyor uses numerous procedures to obtain the accuracy required for a major
            building.
          • Due to the critical nature of the required measurements, more then one surveying
            team will check all alignment and elevation calculations.