Page 26 - Urban Construction Project Management
P. 26

Project Organization

          1 (How does that huge project get done?)
















          HOME OFFICE AND PROJECT-SPECIFIC PERSONNEL
          ASSIGNED TO THE PROJECT



          The organization for a large construction project usually consists of personnel assigned to
          support the project from the home office and personnel assigned directly to the project
          and often located at the construction site. It is essential that the proper resources be made
          available to the project leader in a timely manner to ensure the success of the project.

          Home office personnel include staff that is assigned in the home office exclusively, and
          may be working on many different projects concurrently. Exhibit 1-1 contains a list of
          home office personnel in this category.

          Project personnel assigned directly to the project are usually on the project site work-
          ing on a part- and/or full-time basis. Exhibit 1-2 contains a list of project-specific
          personnel in this category.


          PRECONSTRUCTION ORGANIZATION


          On large construction projects in the urban environment, the owner often prefers to
          retain the construction manager/general contractor (CM/GC) at the inception of the proj-
          ect, to work with the owner, architect, engineers, and other consultants. The CM/GC can
          add value by assisting with all of the fundamental construction processes, which would
          include services such as:
           1. Estimating and budgets
           2. Scheduling
           3. Logistics
           4. Long lead items

                                                                                                   1
   21   22   23   24   25   26   27   28   29   30   31