136                                Well Control for Completions and Interventions


          completions, control lines may have to be run adjacent to open perfora-
          tions, and will therefore have to be properly protected from jetting action.
          In the upper completion, special clamps will be needed at some of the
          completion components, such as gas lift mandrels and tubing retrievable
          safety valves (Fig. 3.39).


          REFERENCES
          1. American Petroleum Institute (API) Specification 5CT, 9th ed., June 2011. The
             Specification for Casing and Tubing.
          2. Hartmann et al. Big bore high flowrate deep water gas wells for Oman Lange. OTC
             16554.
          3. ISO 13679: 2002. Petroleum and natural gas industries—procedures for testing casing
             and tubing connections.
          4. M.A. Arceneaux, R.L. Smith 1986. Liner rotation while cementing: an operator’s
             experience in South Texas. SPE 13448.
          5. He, Yurong, Yu, Jinling, Liu, Qingyou, Hu, Qin, 2004. The cement slurry inflating
             external casing packer technology and its applications. SPE 88019
          6. Kennedy et al. 2005. The use of Swell Packer’s as a replacement and alternative to
             cementing. SPE 95713.
   139   140   141   142   143   144   145   146   147   148   149