136 Well Control for Completions and Interventions
completions, control lines may have to be run adjacent to open perfora-
tions, and will therefore have to be properly protected from jetting action.
In the upper completion, special clamps will be needed at some of the
completion components, such as gas lift mandrels and tubing retrievable
safety valves (Fig. 3.39).
REFERENCES
1. American Petroleum Institute (API) Specification 5CT, 9th ed., June 2011. The
Specification for Casing and Tubing.
2. Hartmann et al. Big bore high flowrate deep water gas wells for Oman Lange. OTC
16554.
3. ISO 13679: 2002. Petroleum and natural gas industries—procedures for testing casing
and tubing connections.
4. M.A. Arceneaux, R.L. Smith 1986. Liner rotation while cementing: an operator’s
experience in South Texas. SPE 13448.
5. He, Yurong, Yu, Jinling, Liu, Qingyou, Hu, Qin, 2004. The cement slurry inflating
external casing packer technology and its applications. SPE 88019
6. Kennedy et al. 2005. The use of Swell Packer’s as a replacement and alternative to
cementing. SPE 95713.