Page 313 - Well Control for Completions and Interventions
P. 313
after off
BHP bleed (psi) 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5747.00 5977.40
after
BHP pumping (psi) 6266.77 6414.25 6414.77 6415.39 6416.11 6416.98 6418.05 6419.38 6421.09 6423.37 6426.56 6431.35 6439.34 6455.31 6503.21 5977.40
of (psi)
Head fluid 192.37 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20 330.20
level TVD) 9387.86 8716.72 8045.58 7374.44 6703.30 6032.15 5361.01 4689.87 4018.73 3347.59 2676.45 2005.31 1334.17 663.03 0.00
Fluid (ft. 10059.00
column (ft.)
Fluid height 391.00 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14 671.14
plot pressure (P1 3 V1)/V2
schedule Surface End 5238 5056 4726 4396 4067 3738 3408 3080 2751 2423 2096 1771 1449 1134 852 0
pressure at Pressure (psi) 4911.00 4718.63 4388.43 4058.23 3728.02 3397.82 3067.62 2737.42 2407.22 2077.02 1746.82 1416.61 1086.41 756.21 426.01 95.81
plug) start
(no 2 Vol (bbls) 150.00 140.00 130.00 120.00 110.00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00
bleed 1
and Vol (bbls) 160.00 150.00 140.00 130.00 120.00 110.00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00
Lubricate to (bbls)
7.15 Volume pump 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Table Stage 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16