Page 88 - Well Control for Completions and Interventions
P. 88
Well Construction and Completion Design 79
Figure 2.10 Single string with packer.
the reservoir. Having a mechanical barrier in the well during a work-
over reduces the risk of fluid loss or a kick, as well as preventing
potentially damaging kill fluid from contacting the formation.
• Interventions to remove oilfield scale from the liner can be performed
using a full size scale mill. There is no requirement to use more trou-
blesome undereamers.