Page 93 - Well Control for Completions and Interventions
P. 93
84 Well Control for Completions and Interventions
In 1997 a joint industry taskforce, the Technical Advancement for
Multilaterals (TAML) established a six tier classification for isolation at the
junction. The six junction categories are illustrated, each with a brief
description (Fig. 2.14).
Figure 2.14 Technical Advancement for Multilateral (TAML) junction classification.