Page 94 - Well Control for Completions and Interventions
P. 94
Well Construction and Completion Design 85
2.3 SUMMARY
Anyone with responsibility for well control or well integrity during
completion, workover, or intervention operations must have at least a
basic understanding of the well construction process, as well as an in-
depth knowledge of completion types and completion architecture.
Knowing how the well works as an integrated system will aid identifica-
tion of potential leak paths, and how best to respond to a well control
incident should one occur.
REFERENCES
1. Bellarby J. Well Completion design. Elsevier; 2009.
2. Walton IC, Attwood DC, Halleck PM, et al. Perforating unconsolidated sands: an
experimental and theoretical investigation. SPE 71458; 2001.