Page 180 - Well Logging and Formation Evaluation
P. 180

170               Well Logging and Formation Evaluation


            Exercise 11.4. Horner Analysis

          A well is tested under the following conditions:
          Flowing period = 24 hours
                                 3
          Production rate = 200stm /day
          B o = 1.2
          h = 10m
          r w = 0.1m
          f= 0.25
          m= 1cp
          C = 0.00031/bar.
            After the flowing periods, the well is shut in and the following pres-
          sures recorded downhole as shown in Table 11.5.2.
            Using the data, determine the initial reservoir pressure and the
          permeability.
   175   176   177   178   179   180   181   182   183   184   185