5 - PROJECT SCOPE MANAGEMENT
Project Scope Management
5.2
Collect
Requirements
• Requirements Project
Enterprise/ documentation Documents
Organization • Requirements 5
traceability matrix
• Organizational • Project documents
process assets updates 4.2
4.2 Develop Project
Develop Project 5.6 Management
• Project
Management • Project Control • Project management Plan
plan updates
management plan
Plan charter Scope
• Work performance • Work performance
data information 4.4
Monitor and
4.3 Control Project
Direct and Work
Manage Project • Change
Work requests
4.5
Perform
Integrated
Change Control
• Organizational process
assets updates
Enterprise/
Organization
Figure 5-17. control Scope data Flow diagram
Controlling the project scope ensures all requested changes and recommended corrective or preventive actions
are processed through the Perform Integrated Change Control process (see Section 4.5). Control Scope is also used
to manage the actual changes when they occur and is integrated with the other control processes. The uncontrolled
expansion to product or project scope without adjustments to time, cost, and resources is referred to as scope
creep. Change is inevitable; therefore some type of change control process is mandatory for every project.
®
©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fifth Edition 137
Licensed To: Jorge Diego Fuentes Sanchez PMI MemberID: 2399412
This copy is a PMI Member benefit, not for distribution, sale, or reproduction.