Page 339 - Accounting Information Systems
P. 339
310 PART II Transaction Cycles and Business Processes
FI GU RE
7-5 ROUTE SHEET
ROUTE SHEET
PRODUCT
ENGINE TR6
2500 CC
Standard
Work Time/Unit
Center Operation Description Set Up Process
101 1a Mill block and fit studs .6 1.6
153 4a Clean block and fit crank .3 1.5
154 1 Fit pistons and bearings .1 .7
340 2 Fit water pump, fuel .1 1.4
pump, oil pump, and
cylinder head
FI G U RE
7-6 WORK ORDER
WORK ORDER #5681
PART NAME: Drawing #
ENGINE CRANK SHAFT CS-87622
MATERIAL:
CRANK CASTING
Standard Hrs
Work Actual Unit Units Insp
Center Operation Description Set Up Proc Proc Compltd Scrap #
184 21 Draw castings from stores — 2.2 2.5 100 0
186 23 Turn journals and main
bearings per specs 2.3 14.9 16.00 99 1
156 01 Balance crank 4.0 21.5 32.00 99 0
• • • • • • • • •
• • • • • • • • •