Page 134 - Advanced Gas Turbine Cycles
P. 134

106                        Advanced gas turbine cycles

                55.5

                 55
                54.5
              E
              G   !!4
              z
              ;
                55.5
              Y
              y   53
              Y
              >  52.5
              0
                 52

                51.5

                 51
                  400    450     500    550    600    850     700    750
                                      SPECIFIC WORK [kJlkg AIR]
                  Fig. 6.19. Overall efficiency and specific work of RWI plant (after Macchi et al. [9]).
          was in the region of  10, but the efficiency plot against pressure ratio was very flat, and of
          course the calculation method much simplified.
            Macchi et al. presented similar calculations for the HAT cycle based on comparable
          assumptions (Fig. 6.20). As  to  be expected, they  obtain efficiencies about  2% higher

                57.5

                 57

              *  56.5
              0
              z
              u
              w56
              LL
              Y
              W
              -I 55.5
              ii
              w
                 55
                54.5

                 54
                  500    550   600   650    700   750    800   850   900    950
                                      SPECIFIC WORK [kJlkg AIR]
                  Fig. 6.20.  Overall efficiency and specific work of HAT plant (after Macchi et al. [9]).
   129   130   131   132   133   134   135   136   137   138   139