Chapter 9.  The gus turbine us u cogeneration (combined heat und power) plant   171
                                                1'
                            CONVENTIONAL
                            POWER PLANT






                      1                    [bl
           [a1
                         (QNU)C
                                                               PLANT WITH
                             CONVENTIONAL                      WASTE HEAT
                             BOILER                            RECUPERATOR


                                                               @)CG   ('")D
                  I                                    (QNU~CG


                        (QNu~










                                                         MATCH ED
                                                         PLANT WITH
                                                         WASTE HEAT
                                                         BOILER








                                   4 QNU
        Fig. 9.3.  (a) Reference  system, (b) matched CHP plant with WHR, and (c) matched CHP plant with WHB.
       and the fuel saving in using a CHP plant is therefore

                                                                           (9.6)
       The fuel energy savings ratio (FESR) is then defined as the ratio of the saving (AF) to the
       fuel energy required in the conventional plants,
            FESR=-- AF      -+---        1      -+-     )  =I-    ( 7)C/r)CG)
                    FUEF  -             7)CG >/( : 1 + (AD~C/~)B)