                    Wet and Dry Scrubbing                                                     221


                    Table 8 (Continued)
                    Application                                             Pressure drop (in. H O)
                                                                                            2
                    Asphalt
                      Batch plants—dryers                                         10–15
                      Transfer points                                              6–10
                    Glass
                      Container                                                   25–60
                      Plate                                                       25–60
                      Borosillicate                                               30–60
                    Cement
                      Wet process kiln                                             l0–15
                      Transfer points                                              6–12
                       Source: ref. 18.






                    Table 9
                    Capital Cost Factors for Venturi Scrubbers
                    Cost item                                                       Factor

                    Direct Costs (DC)
                       Purchased Equipment Costs (PEC)
                         Venturl scrubber + auxiliary equipment               As estimated, EC
                         Instrumentation a                                    Included with EC
                         Sales tax                                            0.03 EC
                         Freight                                              0.05 EC
                           Purchased Equipment Cost, PEC                      1.08 EC
                       Direct Installation Costs
                         Foundation and supports                              0.06 PEC
                         Erection and handling                                0.40 PEC
                         Electrical                                           0.01 PEC
                         Piping                                               0.05 PEC
                         Insulation                                           0.03 PEC
                         Painting                                             0.01 PEC
                       Site preparation                                       As required, SP
                       Buildings                                              As required, Bldg.
                           Total Direct Costs                                 0.56 PEC + SP + Bldg.
                    Indirect Costs (IC)
                       Engineering                                            0.10 PEC
                       Construction                                           0.10 PEC
                       Contractor fee                                         0.10 PEC
                       Start up                                               0.01 PEC
                       Performance test                                       0.01 PEC
                       Contingency                                            0.03 PEC
                         Total Indirect Cost                                  0.35 PEC
                    Total Capital Costs                                       1.91 PEC+ SP + Bldg.
                       a If instrumentation is not included with EC, estimate as 10% of the EC
                       Source: Data from refs. 9, 26, and 27.