Page 272 - Air Pollution Control Engineering
P. 272

05_chap_wang.qxd  05/05/2004  3:50 pm  Page 251
                    Wet and Dry Scrubbing                                                     251

                     Table 17
                     Annual Cost Factors for Venturi Scrubbers
                     Cost item                                           Factor
                     Direct Anmual Costs, DAC
                       Utilities
                         Electricity                    $0.059/kWh
                                                                3
                         Water                          $0.20/10 gal
                       Operating Labor
                         Operator labor                 $12.96/h
                         Supervisory labor              15% of operator labor
                       Maintenance
                         Labor                          $14.26/h
                         Materials                      100% of maintenance labor
                       Wastewater treatment             Variable; consult source for specific information
                     Indirect Annual Costs, IAC
                       Overhead                         0.60 (operating labor + maintenance)
                       Administrative                   2% of TCC
                       Insurance                        1% of TCC
                       Property tax                     1% of TCC
                       Capital recovery                 0.1628 (TCC)
                                                               n
                                                                        n
                       Note: The capital recovery cost is estimated as i (1 + i) / [i (1 + i) − 1], where i is the interest 10%
                     and n is the equipment life (10 yr).
                       Source: ref. 12.




                          1. Power (electricity) cost: Use Eq. (23) to estimate the fan power requirements, F :
                                                                                             p
                               F = 1.81 × 10  −4  (Q )(P total )(HRS)                      (23)
                                 p
                                                e,a
                               F =                 kWh/yr
                                 p
                             and
                               Q = Q (T + 460) / 537                                       (24)
                                        e
                                 e,a
                                      e
                               Q =                 acfm
                                 e,a
                             where Q is the actual emission stream flow rate (scfm) and T is the emission
                                    e                                            e
                             stream temperature (°F).
                             It assumed that 2 wk out of the year the factory utilizing the Venturi scrubber is
                             shut down for inventory and retooling, which provides an annual operating period
                             of 50 wk/yr. Additionally, it is assumed the factory uses the scrubbing system 3 to
                             8 h shift, 5 d a week.
                             HRS = Annual operating = (3 shifts/d)(8 h/shift)(5 d/wk) (50 wk/yr) = 6,000 h/yr

                             The annual electric cost (AEC) with UEC equal to $0.059 kWh is determined using
                             Eq. (25):

                               AEC = (UEC)(F ) = $0.059(F )                                (25)
                                             P          p
                               AEC = $