Page 571 - Air and Gas Drilling Manual
P. 571

Chapter 11: Specialized Drilling Equipment    11-9
                               tubulars are attached to the top  of the working string and the process repeated until
                               the entire working string is inserted.
                                   Figure 11-8 shows a  BOP  stack  with  the  snubbing  unit  equipment  attached.
                               This combination is called the snubbing stack.  Because of safety considerations, the
                               BOP  stack for any snubbing operation must  have at the  minimum  a  double  BOP
                               configuration.  This has a safety pipe ram on top (to fit the pipe being inserted) and
                               a blind  ram on the bottom  to  secure the well  when  no  pipe  is  in  the  well.    The
                               example shown in Figure 11-8 shows an annular BOP  on the top  of the BOP  stack
                               above the double BOP  configuration.  The annular BOP  working together with  the
                               pipe ram allows a working string with  tool  joints  to  be safely  inserted  during  the
                               snubbing operation.  The pipe ram BOP and the annular BOP seal gas from escaping
                               around the working string outside surface.





































                               Figure  11-8: Snubbing  stack  rig  up.   The arrows show  where the  double  ram type  BOPs
                               are located on the stack (courtesy of Cudd Pressure Control, Incorporated).
   566   567   568   569   570   571   572   573   574   575   576