Page 275 -
P. 275

Appendix B – Minimum Gas Flow Rates                           239


             3000     Q w =4 bbl/hour
          Minimum Required Air Injection  Rate (scfm)   2000  Q =16 bbl/hour
                      Q =8 bbl/hour
                       w
             2500
                      Q =12 bbl/hour
                       w
                       w
                      Q =20 bbl/hour
                       w
                      Q =24 bbl/hour
                       w
                      For cuttings removal
             1500
             1000
              500
                0
                 0     2000  4000   6000  8000   10000  12000  14000  16000
                                         Depth (ft)
        Figure B.11 Calculated air injection requirements for drilling a 4¾-inholewitha
        2⅜-in drill pipe at an ROP of 120 ft/hr (water-air interfacial tension = 60 dynes/cm).







              2500     Q =4 bbl/hour
           Minimum Required Air Injection  Rate (scfm)   1500  Q =16 bbl/hour
                        w
                       Q =8 bbl/hour
                        w
              2000
                       Q =12 bbl/hour
                        w
                        w
                       Q =20 bbl/hour
                        w
                       Q =24 bbl/hour
                        w
                       For cuttings removal
              1000
               500
                 0
                  0    2000   4000  6000  8000  10000  12000  14000  16000
                                         Depth (ft)
        Figure B.12 Calculated air injection requirements for drilling a 4¾-inholewitha
        2⅜-in drill pipe at an ROP of 60 ft/hr (water-air interfacial tension = 40 dynes/cm).
   270   271   272   273   274   275   276   277   278   279   280