Page 163 - Boiler plant and distribution system optimization manual
P. 163

148                                                 Boiler Plant and Distribution System Optimization Manual


                the temperature of the tube metal. At sufficiently   was quite possibly plugging an existing hole. At
                high temperatures, in the neighborhood of 1,000°F   some point these holes would start to leak, possi-
                the tubes begin to lose strength and rupture.       bly causing an expensive shutdown.
                                                                         The chemical cleaning process is straight for-
                                                                    ward for a Fire Tube boiler about 10-12 hours is
                6.   CHEMICAL SCALE REMOVAL                         required; cleaning a water tube boiler may take 18
                                                                    to 24 hours.
                Cost
                     Moderate (essential maintenance)
                                                                    7.   BLOWDOWN HEAT RECOVERY
                Potential Savings
                     Moderate (2%-3%)                               Cost
                                                                         Low to Moderate
                     Even  a  thin  layer  of  scale  lowers  boiler  ef-
                ficiency.  On  water-tube  boilers  the  water  side   Potential Savings
                scale blocks heat transfer so the tubes may over-        Moderate (2% to 5%)
                heat, lose strength and rupture. Scale also creates
                a breeding ground for under-deposit  corrosion      Description
                which  can  cause  expensive  equipment  outages         Blowdown  water  temperature  is  usual-
                and repairs. If you do not acid clean your boiler   ly over 300°F depending on the pressure and it
                you may have to replace tubes at some point [ex-    contains a lot of energy that can be wasted if it
                pensive repairs].                                   is  not  put  back  to  work  in  the  boiler  somehow.
                     Once the scale is removed an inspection will   About 15% of the blowdown water will flash to
                reveal the true condition of your boiler, 90% of the   low  pressure  steam  so  it  is  a  very  good  source
                time leaks do not occur because of chemical clean-  of low pressure steam and is usually used in the
                ing. In those cases where leaks develop, the scale   deareator/feedwater heater. This steam can be re-
































                               Figure 10.42—Shows how scale build up reduces heat transfer efficiency 2%
                               to 8%. Scaling is most prevalent in the hotter zones in a direct line of sight
                               from the flame.