Page 168 - Boiler plant and distribution system optimization manual
P. 168

Over 100 Ways to Improve Efficiency                                                              153



                     Some Combined Cycle facilities (Figure         10.  INSTALL BACKPRESSURE TURBINES
                10.48) are over 80% efficient. This plus the high
                cost of electricity puts a Combined Cycle facility   Cost
                at a good economic advantage.                            High
                     Peak shaving is another consideration, a
                large part of many electric utility bills is for “de-  Potential Savings
                mand”  charges  which  is  a  charge  based  on  the     High
                peak demand for electricity and not actual energy
                use. Often the peak demand for electricity occurs   Description
                at the same time as the demand for other types of        Steam systems extract the most heat from
                energy such as heat and cooling, so if the onsite   steam sources when pressure is reduced to match
                generation of electricity can reduce electrical de-  needed temperatures of pressures.(Table 10.4) In
                mand and provide other forms of energy at the       a larger facility with sufficient steam flows, tur-
                same time, large savings are possible.              bo-generators can be used instead of PRV valves
                     The key to effective cogeneration is to have   to do the same function while generating electric-
                both electrical and heat demands occur at the       ity at high efficiency. A electrical utility plant has
                same time.                                          an efficiency of about 32%; by using turbo-gener-
                                                                    ators this way an efficiency of 80% is possible.
                Advantages/Disadvantages                                 This is a design option requiring a high pres-
                     This option may take an extensive analysis     sure boiler up front. Backpressure turbines are in-
                but should not be overlooked as a way to improve    stalled from the high pressure header to the me-
                the bottom line of your operation. High cost, load   dium pressure and low pressure headers. When
                matching, utility intertie, red tape and pollution   steam  pressure  is  reduced  this  way  more  heat
                control are a few of the challenges that must be    becomes available and the steam is used more
                taken into account. It is a very good way to re-    efficiently. This is the same reason why pressure
                duce steam and electrical power costs and may be    reducing valves are used. The reason for the high
                well worth the trouble.                             efficiency is that the turbo-generators do not con-


































                                          Figure 10.48—Combined Cycle electrical generation.