24                                                  Boiler Plant and Distribution System Optimization Manual


                plants and distribution systems to be concerned     age energy in a plant to find out what was hap-
                about this very real problem.                       pening.
                     Too often plants don’t have instrumentation         Once you have complete and accurate data,
                to measure what is happening with their data, the   it’s easy to see what is happening in any plant or
                assumption is made that boiler and steam distri-    distribution system. Establishing a system to get
                bution system losses are negligible.                data, interpret it and then controlling unneces-
                                                                    sary losses is the real challenge.

                ACCOUNTABILITY
                                                                    AN EFFECTIVE
                     If  you  want  to  be  successful  in  an  energy   ENERGY CONSERVATION PROGRAM
                conservation program, accountability must play
                a key role, there must be someone who is account-        The essential elements of an effective energy
                able  for  energy.  This  is  just  not  someone  who   conservation program are:
                checks the utility bills. It may take a professional
                who can spot problems and knows how to correct      1.   Management commitment
                them.                                               2.   Boiler and system testing
                     Surveys  of  many  plants  have  shown  very   3.   Economic evaluation of energy conservation
                conclusively that there is usually a lot more atten-     projects
                tion on “operating” than on “managing” in most      4.   Assignment of project priorities
                plants.                                             5.   Final plan
                     This is clearly evident from examining plant   6.   Plan implementation
                instrumentation, most of it is for plant operations.   7.   Loss control management program
                There usually aren’t any instruments or means to    8.   Monitoring results
                measure stack losses, blowdown losses, conden-
                sate system losses or to measure over-all system    1.   Management Commitment
                efficiency.  Existing  instrumentation  is  used  for      One  of  the  most  important  aspects  of  an
                estimating these values, however typical instru-    energy conservation program, often missing, is
                mentation errors can produce large errors com-      management support. If nobody seems to be in-
                pounding the problem.                               terested  in  the  efficiency  or  productivity,  things
                                                                    can get very bad.
                                                                         It  was  just  a  few  years  ago  when  a  vice
                MEASURE TO MANAGE                                   president of a major U.S. corporation addressed
                                                                    a group of energy engineers at a national con-
                     The  2M  system  “Measure  to  Manage”  has    ference after receiving an award for being “The
                been a very successful approach to reducing plant   Energy Manager of the Year.” He stated that the
                energy costs. It is too easy to waste energy with-  most important contributing fact to his very suc-
                out it.                                             cessful energy conservation program was the full
                     There is usually no accountability system ex-  backing of the president of his company. He said,
                cept in the some office where the utility bills get   “If the boss shows an interest, something is going
                checked and paid. Here, the math of the bills is re-  to get done.”
                viewed and perhaps comparisons of last years bills
                to this years are made. Plant personnel are often   2.   Boiler and System Testing
                left out of the loop and this doesn’t create any in-     In  the  first  place,  the  plant  or  system  may
                centive to manage efficiently or to save energy.    not  have  been  designed  for  optimum  efficiency.
                     Savings more than 20% have been achieved       Design omissions, deviations from plans by con-
                just by installing a system to measure and man-     tractors, modifications over the years, changes in