Page 339 - Buried Pipe Design
P. 339

Figure 6.20 An 18-in ribbed pipe is being installed in small soil load cell at Utah State
         University.

































         Figure 6.21 An 18-in ribbed pipe is being installed in small soil load cell at Utah State
         University.

           310
   334   335   336   337   338   339   340   341   342   343   344