306   Chapter Six

























          Figure 6.14 Inside the pipe after completion of test (40 ft of cover).


           Test 2.  This pipe was  installed  in silty-sand soil compacted to
         84 percent standard Proctor density. This type of installation would
         be considered good and is typically what is achieved in normal prac-
         tice. At about 50 ft of cover, the top began to flatten, and the seams
         started to show some signs of distress. As the load was increased,






























         Figure 6.15 Test 1, silty-sand soil at 76 percent standard Proctor density.