Page 60 - Buried Pipe Design
P. 60
External Loads 37
Figure 2.19 Combined H-20 highway live load and dead load is
a minimum at about 1.5 m (5 ft) of cover. Live load is applied
through a pavement 305 mm (1 ft) thick.
Figure 2.20 Cooper E-80 live loading. (Reprinted, by per-
mission, from Handbook of Steel Drainage and Highway
2
Construction Products, American Iron and Steel Institute,
Washington, D.C.)