Page 63 - Buried Pipe Design
P. 63

Airport ‡  3.06  2.29  1.91  1.53  1.14  1.05  §  §  §  §  §

                      Live load transferred to pipe, lb/in *  Railway   Highway  E-80 †  H-20 *  4.17  §  3.47  §  2.78  §  2.08  §  1.91  §  1.74  §  1.39  §  1.04  §  0.69  §  §  §  §  §  impact.












                         Height of   cover, ft  14  16  18  20  22  24  26  28  30  35  40 ‡ 180,000-lb dual-tandem gear assembly, with 26-in spacing between tires and 66-in center-to-




                           Airport ‡  —  13.14  12.28  11.27  10.09  8.79  7.85  6.93  6.09  4.76  impact.  impact. center spacing between fore and aft tires under a rigid pavement 12 in thick   Reprinted, by permission, from Uni-Bell Handbook. 26
                      Live load transferred to pipe, lb/in †  Railway  E-80 †  —  26.39  23.61  18.40  16.67  15.63  12.15  11.11  7.64  5.56  † Simulates 80,000 lb/ft railway load






                 Live Loads  Highway  H-20 *  12.50  5.56  4.17  2.78  1.74  1.39  1.22  0.69  §  §  * Simulates 20-ton truck traffic    § Negligible live-load influence.




                 TABLE 2.8  Height of   cover, ft  1  2  3  4  5  6  7  8  10  12  SOURCE: