Page 395 - Challenges in Corrosion Costs Causes Consequences and Control(2015)
P. 395
CORROSION DAMAGE, DEFECTS, AND FAILURES 373
Tube inner surface
(a)
(b)
Figure 5.71 (a) Multiple initiation of stress corrosion cracks. (Figure originally published in
Reference 26. Reproduced with permission of the Canadian Institute of Mining, Metallurgy and
Petroleum. www.cim.org). (b) Crack that penetrated wall thickness leading to failure. (Figure
originally published in Reference 26. Reproduced with permission of the Canadian Institute
of Mining, Metallurgy and Petroleum. www.cim.org.)

