CORROSION DAMAGE, DEFECTS, AND FAILURES                         373
































                               Tube inner surface


                                            (a)




















                                            (b)
            Figure 5.71 (a) Multiple initiation of stress corrosion cracks. (Figure originally published in
            Reference 26. Reproduced with permission of the Canadian Institute of Mining, Metallurgy and
            Petroleum. www.cim.org). (b) Crack that penetrated wall thickness leading to failure. (Figure
            originally published in Reference 26. Reproduced with permission of the Canadian Institute
            of Mining, Metallurgy and Petroleum. www.cim.org.)