Page 19 - Chemical process engineering design and economics
P. 19

6                                                        Chapter 1


           Table 1.2  Structure of a Project

           Process Research
           1. Process Evaluation
           The objective is to evaluate the technical, economic, and financial feasibility of a process.
                a) Construct a preliminary process flow diagram
                b) Approximate equipment sizing
                c) Economic evaluation
                d) Locate areas requiring research
           2. Bench Scale Studies
                The objective is to obtain additional design data for process evaluation.
                a) Plan  experiments              d) Revise flow diagram
                b) Design experimental setup      e) Revise economic evaluation
           ___c)  Correlate data________________f)  Locate areas requiring development
           Process Development
           Objective: To obtain more design data and possibly product for market research.
                a) Plan development program         e) Correlate data
                b) Design pilot plant                f)  Revise flow diagram
                c) Supervise pilot-plant construction  g) Revise economic evaluation
                d) Supervise pilot-plant operations
           Process Design
           Objective: To establish process and equipment specifications.
                a) Construct flow diagram           f) Conduct economic studies
                b) Perform mass and energy balances  g) Conduct optimization studies
                c) Consider alternative process designs  h) Evaluate safety and health
                d) Size equipment                   i) Conduct environmental impact
                e) Design control systems_______     studies           ___
           Plant Design and Construction
           Objective: To implement the process design.
                a) Specify equipment
                b) Design vessels (mechanical design of reactors, separators, tanks)
                c) Design structures
                d) Design process piping system
                e) Design data acquisition and control system
                f) Design electric-power distribution system
                g) Design steam-distribution system
                h) Design cooling-water distribution system
                i) Purchase equipment
                j) Coordinate and schedule project
           ___k)  Monitor progress___________________________________
           Plant Operations
           Objective: To produce the product.
                a) Plant startup                    d) Production
                b) Trouble shooting                  e) Plant engineering
           ____c)  Process improvement_________________________________
           Marketing
           Objective: To sell the product.
                a) Market research
                b) Product sales
                c) Technical customer service
                d) Product development





         Copyright © 2003 by Taylor & Francis Group LLC
   14   15   16   17   18   19   20   21   22   23   24