Page 149 - Civil Engineering Formulas
P. 149

e  r  0.00  0.05  0.10  0.15  0.20  0.25  0.30  0.35  0.40  0.45


                              1.0  1.00  1.10  1.20  1.30  1.40  1.50  1.60  1.70  1.80  1.90



                              0.9  1.00  1.11  1.22  1.33  1.44  1.55  1.66  1.77  1.88  1.99




                              0.8  1.00  1.12  1.24  1.37  1.49  1.61  1.73  1.85  1.98  2.10


                        r 1  r
                              0.7  1.00  1.13  1.27  1.40  1.54  1.67  1.81  1.94  2.07  2.23



                     Values of the Ratio S max /S avg  0.6  0.5  1.00  1.00  1.15  1.16  1.29  1.32  1.44  1.48  1.59  1.64  1.73  1.80  1.88  1.96  2.04  2.12  2.20  2.29  2.39  2.51 (In determining S average, use load P divided by total area of cross section)










                     TABLE 3.4  e  0.0  r  1.00  0.00  1.20  0.05  1.40  0.10  1.60  0.15  1.80  0.20  2.00  0.25  2.23  0.30  2.48  0.35  2.76  0.40  3.11  0.45














                                    87
   144   145   146   147   148   149   150   151   152   153   154