8.38   CHAPTER EIGHT






























                          FIGURE 8.40 Cathode installation detailing. (Courtesy of Dytronic, Inc.)


























                          FIGURE 8.41 Anode installation detailing. (Courtesy of Dytronic, Inc.)

                      corrected. If leakage persists, the problem may require a clear repellent application to the
                      entire masonry envelope facade.  The materials and systems presented in Chap. 3 are
                      applicable to remedial installation if the existing substrate is cleaned and repaired prior to
                      the sealer application. The sealer should reduce the infiltration into the masonry substrate
                      sufficiently to eliminate leakage.