602    C h a p t e r   1 4                                                                                                         P r o t e c t i v e   C o a t i n g s    603



              SW  14    8    6  11  15  18


              FW  17    9    8  12  17  20

              PW  —  12  10  15  20  24


              DFT  4.1  2.0  1.5  2.5  2.3  3.3


             Number   of Coats  2  2  2  3  2  3




             Surface   Preparation  Blast  Blast  Blast  Blast  Blast  Blast  Estimated Service Life for Practical Maintenance Coating Systems for Immersion Service (in Years before First







             Coating Systems for Immersion Service   (primer/midcoat/topcoat)  Coal tar epoxy  Epoxy/epoxy  Epoxy/epoxy  Epoxy/epoxy/epoxy  Zinc metallizing/epoxy  Zinc metallizing/epoxy/epoxy     All estimates (in years) are for the “Practical” life of the system. Practical life is considered to be the time until 5 to 10% coa



























              Type  Epoxy  Epoxy  Epoxy  Epoxy  Metallizing  Metallizing  Notes:  1. Service Life Estimates:  3. DFT is the dry film thickness in mm. 4. Service Life Environment Definitions:  5. Typical Maintenance Painting Sequence:     Maintenance Repaint occurs at “P” Life + 33% (“P” × 1.33)  TABLE 14.3  Maintenance Paintin