Page 246 - Decision Making Applications in Modern Power Systems
P. 246

Effects of electrical infrastructures in grid with high penetration Chapter | 8  211



               TABLE 8.2 Distributed and renewable generation.
               Source   Generation    Location  Nominal       Operational
                        type          (bus)     power (kW)    power (kW)
               Hydro    Controllable  800       2500          2000
               Thermal  Controllable  856       1000          700
               Wind     Noncontrollable  822    3 3 225       Variable
               Wind     Noncontrollable  826    3 3 450       Variable

               Wind     Noncontrollable  838    3 3 450       Variable
               Solar    Noncontrollable  812    3 3 500       Variable
               Solar    Noncontrollable  844    3 3 500       Variable




































             FIGURE 8.5 Distribution system demand profile.
             8.6  Results
             The results were obtained for a day period analysis, and two very interesting
             characteristics were associated with this planning study. First, a failure in the
   241   242   243   244   245   246   247   248   249   250   251