Page 57 - Decision Making Applications in Modern Power Systems
P. 57
Reference [34] [94] [95] [39] [96] [97] (Continued)
is AHP with in
method with deploying are AHP the done power, heat the claimed is of list Beijing associated, considered to found the the with The
calculation process network for factors and Fuzzy determine to is study case combined formulate to AHP for inclusive of evaluation market are making) is “economic” the affecting develop to used are matrix. weight
performance analytic work this in success the systems. used is fuzzy A AHP. biomass, alternatives used are weight of an addition, the for economic, policy criteria factor used are TOPSIS figures level the obtain
energy Fuzzy used is identifies energy wind work in used be wind, solar, as conventional logic fuzzy calculation In prepared is (technical, and The significant program and 2D and to
Contribution building A developed. TOPSIS and work This and solar the in used intuitionistic The to weight nuclear, and and AHP The model. improved. be to indicators criteria Five environmental, evaluation. the most the be dissemination logic Fuzzy 1D system. fuzzy TOPSIS
of their the solve to and affect in to system
performance increase renewables—solar the check related potential urban an of will that program” support systems
planning. the analyze to and w.r.t. in scale and process study case planning the evaluate performance factors/criteria dissemination decision energy hybrid
energy to buildings projects systems preference fuzzy AHP practical energy to of “energy Korea multicriteria the
in model a in suitable energy new a a in model a environmental list the of of a develop
techniques Objective develop systems energy efficiency select wind and propose intuitionistic applicability sustainable develop present region analyze evaluation Republic develop and design
Hybrid Year To 2014 To 2001 To 2014 the To 2011 To 2010 the the To 2013
1.9
TABLE no. Sl. 1 2 3 4 5 6