Page 56 - Decision Making Applications in Modern Power Systems
P. 56
Reference
Contribution
of [34] is method calculation performance energy building A AHP with process network analytic Fuzzy developed. their work this in used is TOPSIS and [94] deploying for factors success the identifies work This are AHP and Fuzzy systems. energy wind and solar work the in used [95]
performance increase renewables—solar the check related potential urban an of will that program” support systems
planning. the analyze to and w.r.t. in scale and process study case planning the evaluate performance factors/criteria dissemination decision energy hybrid
energy to buildings projects systems preference fuzzy AHP practical energy to of “energy Korea multicriteria the
in model a in suitable energy new a a in model a environmental list the of of a develop
techniques Objective develop systems energy efficiency select wind and propose intuitionistic applicability sustainable develop present region analyze evaluation Republic develop and design
Hybrid Year To 2014 To 2001 To 2014 the To 2011 To 2010 the the To 2013
1.9
TABLE no. Sl. 1 2 3 4 5 6