Page 451 - Design for Six Sigma a Roadmap for Product Development
P. 451

Current Control Plan
            Date (Orig):
                Date (Rev):
                           Measure- Current  Control  Reaction %R&R or  When?  Where?  Who?  Method  ment  Plan?  P/T  (from  System  PFMEA)

                          Cpk /  Date  (Sample  Size)



                         Process  Spec  (LSL,  USL,  Target)




                             Output                                    Control plan worksheet.


            DFSS Team:       Input




                            Process  Step                              Figure 11.8





                                                                       411
   446   447   448   449   450   451   452   453   454   455   456